In the certification exam, Pass4itsure 600-512 dumps, Implementing with Cisco Network Programmability for ACI (NPENGACI) covers some of the very important topics in this course and you will need to be well prepared for it as the questions that you will be provided to solve will be from these topic areas Requirements Analysis and Collection Deployment Design Development Implementation and Configuration Troubleshooting Optimization and Operation
Exam Code: 600-512
Exam Name: Implementing with Cisco Network Programmability for ACI (NPENGACI)
Updated: Jun 09, 2017
Q&As: 112
Exam Information: https://www.pass4itsure.com/600-512.html
Now, Cisco 600-512 exam become more and more popular. Pass4itsure 600-512 dumps provide comprehensive coverage of Cisco 600-512 dumps while keeping it all still simple enough for you to understand it easily.
Pass4itsure Latest and Most Accurate Cisco 600-512 Dumps Q&As
QUESTION 35
In an underfloor duct system, pre-set inserts should be leveled to 1/8 inch below the finished pour.
A. False
B. True
Correct Answer: B QUESTION 36
An underfloor preset insert must be used in a post-tensioned pour.
A. True
B. False
Correct Answer: A QUESTION 37
Underfloor duct systems cannot be used with “slab on grade” floor structures.
A. True
B. False
Correct Answer: B QUESTION 38
What is the maximum pulling force guideline for a 2 or 4 strand fiber cable?
A. 100 lbs
B. 75 lbs
C. 50 lbs
D. 25 lbs
Correct Answer: C QUESTION 39
An Interconnection is a connection scheme between cabling runs, subsystem, and equipment using patch cords or jumpers that attach to connecting hardware on each end.
A. True
B. False
Correct Answer: B QUESTION 40
The recommended bend radius for a cable during installation is typically greater than the recommended bend radius after the cable is installed.
A. False
B. True
Correct Answer: B QUESTION 41
A horizontal cabling link is distinguished from a horizontal cabling channel because it does not include which of the following.
A. Equipment cords in the TR.
B. Does not include a CP.
C. Does not include a TP.
D. Cords in the WA that extend beyond the TO/connector.
Correct Answer: AD QUESTION 42
What would be the pair color of pins 3 and 6 of a T568B 8 pin modular jack?
A. Green
B. Brown
C. Orange
D. Blue
Correct Answer: A QUESTION 43
The must be critically involved early in the construction project, long before the plans are finalized.
A. False
B. True
Correct Answer: B QUESTION 44
Horizontal slack in the form of bundled loops have been known to degrade cabling performance.
A. False
B. True
Correct Answer: B QUESTION 45
Outlets that serve an individual work area may not be located in more than one faceplate.
A. False
B. True
Correct Answer: A QUESTION 46
Which one of the following would meet the minimum horizontal cabling support for an individual work area location?
A. One Category 3 copper cable and one (2 fiber) 50/125 micron fiber.
B. Two Category 3 copper cables.
C. One Category 3 and one Category 5e copper cables.
D. Two Category 5e copper cables.
E. One Category 5e copper cable and one (2-fiber) 62.5/125 micron multimode fiber.
F. Two (2-fiber) 62.5 micron multimode fiber.
Correct Answer: QUESTION 47
Centralized fiber cabling allows the use of pull-through cables, an interconnect, or splices in the TR.
A. False
B. True
Correct Answer: B QUESTION 48
Utility columns may be attached to the transverse rails of a suspended ceiling only if these rails are securely anchored to the main ceiling support channel.
A. False
B. True
Correct Answer: B QUESTION 49
Which of the following is a description of a “ventilated channel’ cable tray?
A. A ventilated bottom with side rails.
B. Solid bottom with longitudinal side rails.
C. Open tray having a central rigid spine with cable support ribs along the length at 90 degree angles.
D. Two side rails connected by individual transverse members.
E. Channel section with a one-piece bottom no more than 6 inches wide.
Correct Answer: E QUESTION 50
In a home run conduit system, a single horizontal cable can serve up to three outlet boxes.
A. False
B. True
Correct Answer: A
QUESTION 51
What is the minimum number of 4 inch floor sleeves for a building with a total usable floor space of 5000 m (50,000 sq. ft.) to 10,000m (100,000 sq. ft.)?
A. 4
B. 3
C. 9-12
D. 5-8
Correct Answer: A QUESTION 52
Lose buffered fiber optic cable generally have a 900 micron plastic coating applied directly to the fiber.
A. True
B. False
Correct Answer: B QUESTION 53
What is the permitted substitutes for a fiber optic cable rated OFNP?
A. OFNG
B. None
C. OFCP
D. OFNR
Correct Answer: B QUESTION 54
Premises centralized multimode optical fiber can be installed up to how many meters/feet?
A. 300 m (984 if)
B. 100 m (328 if)
C. 500 m (1640 ft)
D. 2000 m (6560 if)
Correct Answer: A QUESTION 55
As a general guideline in premises applications for backbone cabling, 62.5/125 or 50/125 micrometer multimode optical fiber is recommended for greater distances and higher data rates.
A. True
B. False
Correct Answer: B
Pass4itsure 600-512 dumps practice exam is prepared keeping in minding a beginner and don’t use complex wordings or terms. It is easy to pass your Cisco 600-512 Exam in your first attempt using Cisco 600-512 dumps. Pass4itsure Cisco 600-512 practice exam will definitely lead you to better career prospects.
We provide free updates for 90 days from the date of purchasing. Pass4itsure also provides free technical support and live chat 24/7 for your https://www.pass4itsure.com/600-512.html 600-512 dumps. In order to keep our customers date secure, we uses unbreakable security protocols by McAfee and SSL 64-Bit.